Currently the remaining finishing works are taking place. The first technical tests have been done.
The work in the field of outdoor facilities is in full...
All about 80% of the finishing works is completed. The facades are partially deconstructed.
[gallery columns="4" link="file" size="medium" ids="1774,1792,1791,1790,1789,1788,1787,1786,1785,1784,1783,1782,1781,1780,1779"]...
We have now completed the shell construction in our Carré Voltaire and the interior construction is going into the crunch mode.
[gallery columns="4" link="file" size="medium"...
February 2017, the shell construction on the corner Kurfürstenstraße / Else-Lasker-Schüler-Straße is now on the second floor.
[gallery columns="4" link="file" size="medium" ids="1632,1633,1634,1635,1636,1638,1639,1637,1651,1648,1647,1646,1645,1644,1643,1642,1641,1640,1649"]...
In June 2016, we had a look to the construction progress of the Carré Voltaire from the bird’s-eye perspective .
The earthworks are now completed and...
Already in March 2016, we started the earthworks on the corner Kurfürstenstraße / Else-Lasker-Schüler-Straße.
Overall, around 17,900 m3 soil will be excavated, so that the construction...